What to do
1. Download the form
2. Check form 4 or 7
If you plan to build a sign, check 4.
If you plan to paint a sign or put up a non-structural sign, check 7.
3. Describe the building where you plan to put your sign
Include the building’s:
- Type of construction
- Number of stories
- Present use
- Height (measuring the center of the front of building)
- Estimated cost
4. Describe your sign
Type of sign
Check the type of sign you plan to put up. You may check more than 1 box.
Sign description
Describe your sign, including its size, weight, and thickness.
Illumination
If you plan to illuminate your sign, check which method of illumination you will use.
Learn more about illumination methods.
Street space use
Tell us if you plan to use any street space during construction of your sign.
Purpose
Tell us the purpose of your sign.
People
Provide contact information for people who will help design or construct your sign. This may include contractors, architects, construction lenders, or building owners.
Plot plan and elevation
Include the plot plan and elevation drawings from your sign plans.
5. Sign your application form
6. Submit your application to the Permit Center
After you have completed the application, print 2 copies of the application on double-sided legal (8.5” by 14”) paper.
Bring it to the Permit Center to submit your application.
Permit Center
49 South Van Ness2nd floor
San Francisco, CA 94103
Mon to Tue,
7:30 am to 4:00 pm
Wed,
9:00 am to 4:00 pm
Thu to Fri,
7:30 am to 4:00 pm
Get help
Technical Services Division
Last updated November 9, 2022