2901-2929 16th St. Rehab - GC, Seismic and Accessibility Upgrades
Project Summary: Rehabilitation of a 63-unit class A building, including seismic, commercial and residential accessibility upgrades per CBC chapter 11B. 2. Scope of Work: Seismic retrofit, commercial ADA upgrades, new roof, windows, façade repointing, electrical service upgrade, new fire alarm system, and 20 units’ renovations.
Seeking: General Contractor
Goal: LBE 20%
Mandatory Pre-bid Meeting: 12/13/2024
Bids Due: January 6, 2025
Contact: Sara Lope Phone (619) 773-3800 Email sara@zubiconsulting.com
Link to SF City Partner Post - Search for Event ID 0000010197.
249 Pennsylvania Design Build RFP
249 Pennsylvania is the site of a proposed affordable family project of at least 120 units, at the corner of Pennsylvania Ave and Mariposa Street and backing up onto I-280. Though the adjacent street is significantly sloped, this is an already excavated site, which is currently sitting vacant. The UMU zoning and 40-x height limit lends itself to residential multifamily development, and using the State Density Bonus, allows for a mid-rise building to maximize unit count. The project team’s goals for the design build approach are to maximize density, streamline schedules, and to control costs. To that end, the Owner will look to the architect and general contractor partners to expedite the entitlement process by complying with streamlining legislation, like SB-25 or AB-2162, and to control costs through efficient design, such as reducing unit types, simplifying the massing, and improving constructability.
Seeking: Design Builder
Goal: SBE 25% Design; SBE 25% Construction
Bids Due: January 15, 2025
Contact: Pennsylvania Team Email Pennsylvania@tndc.org
Link to SF City Partner Post - Search for Event ID 0000010201.
Potrero Power Station Block 2 Trades
The project includes an 8-story building over 3-story basement. The project incorporates 4 components: 1) Proton therapy center (occupying most of the Basement) 2) 8 story Core and warm shell building 3) Tenant improvement for UCSF clinical floors (2-5) 4) Future life-science incubator floor TI on top 3 floors and symposium space on level 1 The project is generally bound by Craig Lane to the north, the Maryland Street to the east, and Louisiana Street to the west. This proposal would be for the MEPF, Elevator and Water-proofing trades.
Seeking: Mechanical, Electrical and Fire Alarm, Plumbing, Fire Protection, Elevator, Waterproofing
Goal: SBE 20%
Bids Due: December 4, 2024
Contact: Trisha Ngo Phone: (415) 732-9061 and Email: trishan@dpr.com
Link to SF City Partner Post - Search for Event ID 0000010183.
160 Freelon - GMP Remaining trades
THIS IS A CAHILL-GUZMAN JV PROJECT. OWNER/DEVELOPER: Related California / San Francisco Housing Development Corporation (SFHDC). New Construction / 102,000 gsf / 85 Units / Family Housing / 1 Building / 9 Stories / All Type I Concrete. Mix of studio and up to 3-bedroom units. The ground floor includes a main lobby, offices, a multipurpose room, bicycle parking, and building services. No vehicle parking is included. TENTATIVE SCHEDULE: Begin construction in 2nd Qtr 2025 with a total 22-month duration. Ref.
Seeking: Many trades including:
- Demo, Earthwork, Shoring & Underpinning, Structural Concrete, Masonry, Structural Steel & Misc. Metals, Glazing, Exterior Siding & Metal Panels, Plaster, Roofing & Waterproofing, Sheet Metal, Caulking & Sealants, Metal Stud Framing & Drywall, Insulation, Finish Carpentry, Quartz & Cultured Marble Countertops, DFH, OH Coiling Doors, Tile & Stone, Acoustical Ceilings, Flooring – Polished Concrete, Painting, Misc. Specialties, Pest Control, Signage, Toilet & Bath Accessories, Appliances, Trash Chutes/Compactors, Window Treatments, Plumbing, HVAC, Electrical, Asphalt Paving & Striping, Site Concrete, Landscape, Site Utilities, Personnel Hoist, Scaffold, Site Security, Final Cleaning.
Goal: SBE 20%
Bids Due: November 22, 2024
Contact: Cahill Estimating Phone: (415) 677-0611 and Email: estimating@cahill-sf.com
Link to SF City Partner Post - Search for Event ID 0000010112
Sunnydale Block 7 - GMP Remaining trades
THIS IS A CAHILL-GUZMAN JV PROJECT. OWNER: Mercy Housing. New Construction / 137,142 gsf / 89 Units / Affordable Housing for Rental / 1 Building / 5 Stories / Type VA over Type 1A Garage OWNER: Mercy Housing ARCHITECT: Saida + Sullivan Design Partners TENTATIVE SCHEDULE: Begin construction in June 2025. Duration is 19 months. LABOR REQUIREMENTS: Union Labor required for carpenters, laborers, operating engineers only.
VOLUNTARY VIRTUAL PRE-BID MEETING: Wednesday, November 6, 2024 @ 10:30 a.m.
Seeking: Many trades including:
- Earthwork, Surveying, Structural Concrete, Masonry, Structural Steel, Rough Carpentry, Glazing, Exterior Siding, Plaster, Roofing & Waterproofing, Sheet Metal & Metal Panels, EBM, Gypcrete, Metal Stud Framing & Drywall, Insulation, Finish Carpentry, Countertops, DFH, OH Coiling Doors, Tile, Acoustical Ceilings, Flooring – Carpet, Flooring – Sealed Concrete, Flooring – Epoxy, Painting, Misc. Specialties, Signage, Toilet & Bath Accessories, Appliances, Trash Chutes/Compactors, Window Treatments, Plumbing, HVAC, Electrical, Striping & Parking Bumpers, AC Paving, Site Concrete, Landscape, Site Utilities, Scaffold, Site Security, Final Cleaning.
Goal: SBE 20%
Bids Due: November 21, 2024
Contact: Cahill Estimating Phone: (415) 677-0611 and Email: estimating@cahill-sf.com
Link to SF City Partner Post - Search for Event ID 0000010100
650 Divisadero St - Professional Services
Jonathan Rose Companies and Young Community Developers (“Sponsors”) in collaboration with the Mayor’s Office of Housing and Community Development (MOHCD), the Sponsors of 650 Divisadero (the “Site”) intends to construct an affordable rental housing project serving a minimum of 95 low-income family units, including 24 households experiencing homelessness, and ground-floor commercial use servicing the surrounding neighborhood and the residents at the Site. All sub-consultants to the architect services begin with the Schematic Design phase through the Construction Administration phase.
Seeking: Joint Trench and Dry Utilities, Lighting, Security and Low voltage, Vibration and Adjacent Property Monitoring, Waterproofing, Specifications, Exterior Building Maintenance
Goal: SBE 25%
Bids Due: November 22, 2024
Contact: 650 Divisadero Team Phone (650) 804-5755 Email: grovestreetaffordablehousing@ycdjobs.org
Link to SF City Partner Post - Search for Event ID 0000010120
Leland House Rehab.
PRC (formerly Positive Resource Center), established in San Francisco, is a nonprofit organization committed to providing residential, health and wellbeing services for their clients. PRC is currently requesting qualifications from licensed contractors to provide construction contracting services for the work specified in the MOH-3 RFQ, in the bid package
Seeking: Plumbing work, roofing repairs, HVAC system upgrade, and targeted repairs to address leaks and water damage throughout the building. Additionally, the renovation will include the creation of a new teaching kitchen and repairs to the dining room to better serve residents, as well as the modernization of the elevator and replacement of the lift to ensure full accessibility.
Goal: SBE 25%
Bids Due: November 20, 2024
Contact: Kathy Brown Email kbrown@venturapartners.com
Link to SF City Partner Post - Search for Event ID 0000010091
Balboa Reservoir Infrastructure GC
The Balboa Reservoir (Reservoir) is a 17-acre site located across from City College. The masterplan calls for a series of 7 multifamily buildings and approximately 100 for sale townhomes for a total of 1100 units. The sponsor of this project is BRIDGE Housing and is requesting for the phase 1 infrastructure portion of the masterplan. The work under this bid will include demolition, grading, street and transportation improvements, open space improvements, combined sewer system, stormwater management, and pad readiness for Buildings E and A as described in the SIP plans and specifications. The work designed and included in the SIP is necessary for the fully functional public infrastructure, which will serve Building E, Building A, and future buildings on the site.
Seeking: General Contractor
Goal: SBE 25%
Bids Due: December 4, 2024
Contact: Andrew Johnson Email: anjohnson@bridgehousing.com
Link to SF City Partner Post - Search for Event ID 0000010077