該怎麼做
1. Fill out an application
Download and fill out an application for your type of well. Monitoring wells and soil borings help track groundwater conditions. Production wells pull groundwater to use.
2. Collect your fees
You will need to pay:
- An application fee (payable by check or money order to the SF Department of Public Health)
- A deposit fee for the first hour of inspection time for your type of well
You can pay all your fees with 1 check.
If the inspection lasts more than an hour, we will send you a bill. You must pay the bill within 30 days.
3. Include information for a production well
If you are building a production well, include:
- Your proposed construction specifications
- A detailed map or plot plan
- A site safety plan
4. Submit your items
Make sure to submit your documents at least 30 days before you start drilling. Email your items to Eurich.Santiago@sfdph.org.
You can also mail or deliver your documents in-person to:
Environmental Health
49 South Van Ness AvenueSuite 600
San Francisco, CA 94103
If submitting by mail, include "ATTN: Well Program" in the address.
5. Schedule a well inspection
Schedule your inspections in advance if possible. You must wait until your inspection before you start work on the well.
- Email Eurich.Santiago@sfdph.org
- Call 415-252-3800
Permit duration
We will review your application and give you the permit.
- If you are building a well or soil boring, your permit will last 6 months.
- If you are destroying a well or soil boring, your permit will last 90 days.
聯絡我們
- Email Eurich.Santiago@sfdph.org
- Call 415-252-3800
最後更新 September 4, 2024