Electrical (EID) scheduling codes
- 100 - Rough cover/re-inspection
- 103 - Green tag - Energize service
- 105 - Orange tag - Energize temp service
- 109 - Survey
- 110 - Witness test (transfer to operator)
- 111 - Concrete encased electrode
- 117 - Long duration inspection (transfer to operator)
- 301 - Complete
- 302 - Complete with GT
- 307 - Witness test complete (transfer to operator)
Plumbing (PID) scheduling codes
- 100 - Gas tag request
- 101 - Survey inspection (transfer to operator)
- 105 - Complaint inspection (transfer to operator)
- 119 - More than one slot needed (transfer to operator)
- 200 - Underground dwv piping
- 201 - Underground domestic water piping
- 202 - Underground fire sprinkler service
- 208 - Boiler installation
- 212 - Radiant heat piping
- 213 - Building drain/sewer/house trap
- 228 - Shower pan installation
- 300 - Rough in drain, waste, and vent
- 302 - Rough in gas piping
- 304 - Rough in flues/vents/furnace
- 305 - Rough in fire sprinklers (transfer to operator)
- 320 - Rough in plumbing
- 400 - Final plumbing inspection
- 401 - Final mechanical inspection
- 402 - Final water heater
- 403 - Final furnace
- 404 - Final house trap/building sewer/storm sewer
Building (BID) scheduling codes
- 101 - Start work
- 106 - Final inspection
- 111 - Site verification
- 112 - Police permits - entertainment (transfer to operator)
- 113 - Fire permits - entertainment (transfer to operator)
- 120 - Forms
- 121 - Forms, partial
- 122 - Reinforcing steel/Rebar/Foundation/Concrete slab/Concrete pour/Piers/Shoring/Retaining wall/Anchor bolts
- 123 - Ok to pour
- 124 - Ceiling inspection
- 125 - Rough frame, partial
- 126 - Rough frame/Fire wall
- 127 - Insulation
- 129 - Shear wall/Plywood nailing
- 132 - Flues/vents/ducts (Fireplace/Grease shaft)
- 133 - Lath, exterior/Paper or Stucco wire
- 134 - Ok to cover/Interior lath
- 135 - Sheetrock nailing/Drywall nailing
- 142 - Pre-final
- 145 - Temporary certificate occupancy issued
- 146 - Mechanical
- 147 - Ceiling inspection, partial
- 153 - Ok to pour, partial
- 154 - Ok to cover, partial
- 200 - Long duration inspection (transfer to operator)