1931
potholes filled
IN 2025 (Thru 3/25)
1151
trees pruned
IN 2025 (Thru 3/25)
136
curb ramps installed
IN 2025 (Thru 3/25)
89
blocks resurfaced
IN 2025 (Thru 3/25)
2559
tons of debris collected
IN 2025 (Thru 3/25)



